Today, they are the two most solid alternatives to work with BIM technology. For the new building of the biomass receiving and treatment plant, ingenta submitted a proposal to the client to 3 implement this construction project as a BIM project. Allplan vs Revit, two strong options to work with Building Information Modeling. We also use the openBIM solution Allplan Bimplus, says Andreas Liesen, referring to the current uses. "We use Allplan Engineering to develop 3D models and exchange data in BIM projects.
•“On the one hand, we had to align the new building with the structures present on the existing foundation walls, but on the other hand, we had to coordinate the operational requirements with the entire receiving area as well as the process technology for treating the biomass,” says project manager Hans Peter Bütikofer from “ingenta ag ingenieure + planer” as he describes the challenges. For running a PythonPart in Allplan, you need at least two files: With the construction of a new receiving and treatment plant for biomass on the site of the former sludge drying plant, “Ara Region Bern AG” will be able to increase the future production of biogas by around 25 percent. “Ara Region Bern AG” is one of the largest wastewater treatment plants in Switzerland. 3D models are created at Vollack with Allplan using their own CAD component library and are enhanced with smart data. .īiomass receiving and treatment plant “Ara Region Bern AG”
To be able to take such aspects into consideration in detail, the architects and engineers at Vollack use the software from ALLPLAN during the design phase, and in certain cases, even adapt it for individual needs. In addition, the project’s energy goals and the pre-defined working method Building Information Modeling (BIM) played a major role for Vollack. Secondly, the focus of the development process was about optimizing the working environment, by linking work processes and creating short travel distances within the building. It is ultimate, precisely working universal software that has been in use for a long time.
It gives full control over the projects and helps in producing prcised building drawings and blueprints. The first challenge was to create space for the files as well as sufficient office space. Allplan BIM Software is a modelling software solution that is best for engineers and architectural firms.
They were planning the new office and residential building here and commissioned the Vollack Group to design it. ristav GmbH is a medium-sized company from the Karlsruhe area, which has a plot in the newly developed Karlsruhe industrial park, Kirchfeld-Nord. Construction began in 2017 and the planned completion date is summer 2018.
The construction project “ristav CUBE” is a classic example of a project with customer-specific features. Project: ristav CUBE, Karlsruhe area, Germany